Industrial Electric Clean Steam Generator Price for Steam Sterilizer and Washing Workstation

Jiangsu Rooe Medical Technology Co., Ltd.
  • Audited Supplier
  • 14 yrs

Contact Supplier

Product Highlights

  • Stainless Steel Construction: Furnace body and heat exchange system made of stainless steel with internal polishing for steam cleanliness.
  • Automatic Control System: Automatically controls air intake volume based on steam demand for low loss at low load utilization.
  • Multi-Layer Safety Protection: Features triple liquid level control, dual pressure control, safety valve, and temperature protection device.
  • LCD Display & Control: Equipped with LCD screen to control and display operating data for easy monitoring.
  • Water-Electric Separation: Separated electric box design effectively prevents electrical short circuits or shock accidents.
  • CE and FDA Certified: Product has passed strict debugging and holds CE and FDA certifications for safety and compliance.
  • Parallel Installation Support: Multiple units can be installed and used in parallel to meet higher capacity requirements.
  • Customizable Evaporation Rate: Rated evaporation available in 50, 75, 100, 130, and 150kg/H options.

Product Images of Industrial Electric Clean Steam Generator Price for Steam Sterilizer and Washing Workstation

Industrial Electric Clean Steam Generator Price for Steam Sterilizer and Washing Workstation pictures & photos
Industrial Electric Clean Steam Generator Price for Steam Sterilizer and Washing Workstation

Find Similar Products

Product Description

Industrial Electric Clean Steam Generator Price for Steam Sterilizer and Washing Workstation
Industrial Electric Clean Steam Generator Price for Steam Sterilizer and Washing Workstation
Features:
1.  The furnace body and heat exchange system are made of stainless steel and are internally polished to ensure steam cleanliness.
2.  The control system can automatically control the air intake volume of industrial steam according to the demand for steam, thus achieving low loss at low load utilization.
3.  Multiple chain security systems:
1) The boiler liquid level adopts three groups of liquid level control: high, medium and low to prevent the equipment from dry burning of the heat exchange tube due to water outage;
2) The boiler pressure adopts dual pressure control, the working pressure is adjustable, and the protection pressure is set to 0.5MPa.  Once overpressure occurs, the industrial steam is automatically cut off from entering the heat exchange tube;
3) The set pressure of the safety valve is 0.55MPa, which is a full-open safety valve.  Once the pressure is overpressured, it will automatically release the pressure.
4) The inner wall of the boiler is equipped with a temperature protection device.  When the temperature of the furnace wall exceeds 155 degrees, it will automatically cut off the power supply and issue an audible and visual alarm.
4.  LCD screen controls and displays operating data.
5.  The water and electricity separated electric box can effectively prevent electrical short circuits or electric shock accidents under water.
6.  The products have passed strict debugging before leaving the factory.  The user only needs to connect the power supply and water source, and press the start button for the boiler to enter fully automatic operation.
7.  status, no complicated installation required
8.  Multiple units can be installed and used in parallel.

 

Product Parameters
Model W-0.1-0.5-LDR Pro W-0.2-0.5-LDR Pro
Overall Size(L*W*H) 980*720*1350mm 980*850*1650mm
Industrial steam consumption 110/220kg(pressure 0.7-1.0Mpa)
Rated Clean Steam Volume 100/200kg/h
Saturated Steam Temperature 158ºC
Power 220V/50HZ
Built-in heat exchanger 316L coil
4 Set 8 Set
Rated steam pressure 0.5Mpa

 

Company Profile

 

Industrial Electric Clean Steam Generator Price for Steam Sterilizer and Washing Workstation
Industrial Electric Clean Steam Generator Price for Steam Sterilizer and Washing Workstation

About the Supplier

This supplier has been audited by SGS. Verify the report on the official SGS website with ID "QIP-ASR2441247". Items marked "verified" are certified.

Watch Video
Watch Video
Jiangsu Rooe Medical Technology Co., Ltd.
Jiangsu Rooe Medical Technology Co., Ltd.
Jiangsu Rooe Medical Technology Co., Ltd.
Jiangsu Rooe Medical Technology Co., Ltd.
Jiangsu Rooe Medical Technology Co., Ltd.
Jiangsu Rooe Medical Technology Co., Ltd.
Jiangsu Rooe Medical Technology Co., Ltd.
Jiangsu Rooe Medical Technology Co., Ltd.

About Our Factory & Business Background

Address
No. 19, Renmin East Road, Yangshe Town, Zhangjiagang City (Cathay Pacific Plaza) Z1310, Suzhou, Jiangsu, China
Terms of Payment
LC, T/T, PayPal, Western Union, Small-amount payment, Money Gram, Cash
International Commercial Terms(Incoterms)
FOB, EXW, CFR, CIF, DAT, FAS, DDP, DAP, CIP, CPT, Others, FCA
Average Lead Time
Peak Season Lead Time: one month
Off Season Lead Time: within 15 workdays
Nearest Port
shanghai, Ningbo, Qingdao

Our Production Capability & Technical Expertise

Main Products
Hospital Bed, Operating Table, Operating Light, Sterilizer, Cssd Equipment, Funeral Product, Stretcher, ICU Device, Hospital Furniture, Rehabilitation Equipment

Our Industry Experience & Global Business Record

Export Year
2009-07-01
Main Markets
North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe

FAQ

What is the rated evaporation capacity?
The rated evaporation is customizable with options of 50, 75, 100, 130, and 150kg/H.
What materials are used for the furnace body?
The furnace body and heat exchange system are made of stainless steel and are internally polished.
What safety systems are included?
It includes triple liquid level control, dual pressure control, a full-open safety valve, and temperature protection.
Is the product certified?
Yes, the product holds CE and FDA certifications and undergoes strict debugging before shipment.
What is the lead time for delivery?
Peak season lead time is one month, while off-season lead time is within 15 workdays.
Can multiple units be installed together?
Yes, multiple units can be installed and used in parallel to increase capacity.
What payment terms are accepted?
Accepted payment terms include LC, T/T, PayPal, Western Union, Small-amount payment, Money Gram, and Cash.

Send your message to this supplier

Contact Information
Recipient
Message

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now